We had a bit of a bumpy start but that was the bank being a bank and had nothing to do with NCH. From slab down to completion everything was very well planned out with very little wait time in between teams rocking up. As the build progressed we just flew past others building at the same time. Total build time minus the bank screw-up was just over 5 months.
We have built on a rural block with the extra challenges that entails and we had a few minor disappointments which pretty much all came down to us not spotting the problems before signing the contract. An example was 3 phased power not included even though everything was designed for it. If this had been picked by the builder at pre-start I would give NCH 100% score, but with these minor nitpics I will give them 97/100%